Electric Vehicles (EV) Charger Enabling Works for Car Parking Spaces at University Residence Nos. 10 – 17
To facilitate the electric vehicles (EV) charger enabling works for car parking spaces at University Residence Nos. 10 – 17, the works will be implemented from 6 January 2025 to End of June 2025. Please refer to below diagram for the location. We apologize for any inconvenience caused.
教職員宿舍第十苑至第十七苑停車位置加裝電動車充電裝置基建設備
為配合教職員宿舍第十苑至第十七苑停車位置加裝電動車充電裝置基建設備,工程將於2025 年1月6日至2025 年6月下旬期間完成。施工地點請參閱下圖。 工程期間引起之不便,敬請見諒。